3B Semi ILM unit
Records voltage, current, power and energy readings at the light and sends them to the server over cellular.
- Voltage, current, power and energy
- Cellular data reporting
- Configuration and compatible equipment updates
3B SemiconductorsDesigned and developed by 3B Semi for EESL streetlight projects, our ILMS pairs a light-level monitoring unit with server software. It records each light’s readings and keeps faults, service activity and reports together.
The 3B Semi ILM unit measures voltage, current, power and energy at each streetlight, then sends readings to the ILMS server over cellular. Our software combines these readings with asset and service records.
Records voltage, current, power and energy readings at the light and sends them to the server over cellular.
Our software shows each light’s status and keeps its fault, maintenance and restoration history with the asset record.
Set the service window, uptime measure and energy baseline for your project. Reports show readings against those settings and identify gaps in the data.
View a light’s status and readings, check fault counts and open its report history.
Group poles and equipment by panel, ward or service area on the map.
Set the service window, energy baseline and rules for gaps in readings.
Download PDF, CSV and Excel-compatible reports. Schedule email delivery for government reporting.
Set role and area permissions, enable optional two-factor sign-in and manage system settings and weekly backups.
Physical switching and firmware updates require compatible equipment. We confirm these functions for the project hardware.
These sample readings show a light reported on from 18:00 to 18:02.
| Time | Power | Energy counter | Lamp state |
|---|---|---|---|
| 18:00 | 60 W | 10.000 kWh | ON |
| 18:01 | 60 W | 10.001 kWh | ON |
| 18:02 | 60 W | 10.002 kWh | ON |
Example only. Project reports use the agreed contract settings and the readings received by the system.
We review the following tender requirements with you against the selected hardware, connection and hosting arrangement.
Check final assembly test evidence against the tender limits: up to 2 A, no more than 5% reading error, below 3 W and an internal antenna.
Physical switching, firmware updates and IPv6 require compatible equipment. Confirm operation through an end-to-end project test.
Confirm MeitY cloud eligibility, India data residency, security assessment and the 99.5% availability target. CPU and disk limits need active monitoring.
Book a walkthrough of the 3B Semi ILM unit and server software. We will review the hardware, connectivity and hosting requirements for your project.
Book an ILMS walkthrough →